| Certificate Number: AW-2210 6201 Inspection Date: 25/10/2022 Customer Name: DHIFAF ALKALEEG COMPANY Date of Certificate: 25/10/2022 Certificate Page: 1 of 1 Due Date of Cert.: 24/04/2023 |
|||
|
Item Description Guard Tower Tower Serial No. DH-04 |
|||
| NO. of Points | Status | ||
| 8 Each tower | ACCEBTABLE | ||
| Testing Method NDT (MPI Test) & Visual Test. |
Safe working Load (SWL)
2.4 TON |
Final Results Passed |
|
| Test Results | |||
| All the above mentioned Points has been tested and found without any mentioned failure. | |||
About Ard AL-Wahran
Ard AI-Wahran is one of the active Iraqi companies in Oil and Gas Oilfields Services. Infrastructure, General Trading, Testing Services, 3rd Party Inspection Services, Calibration, and Engineering Inspection Services. The company was established in 2014 to serve our client’s requirements in professional reliability regarding the trading & Supply, Calibration, and Inspection Services.
Our Services
Contact Info
Iraq/Basra/Albradhia
Iraq/Basra/Health Center/Near Al-Falahat Square or Al-Farahidi Schools
info@ard-alwahran.com
+964 774 80 00 030
+964 784 20 00 030









